• 需求方提出视频制作需求

    (The demand side make their videos' demands.)
  • 确定制作难度和时间,制作方提供制作方案

    (Ensure the degree of difficulty and time, the producer provide the plan.)
  • 双方协商通过后签订合同,需求方预付50%定金

    (The producer provide a sample in the limited time, the demand side.)
  • 需求方向制作方提供制作所需素材后制作方开始制作

    (The demand side provide the required materials and then the producer begin to make.)
  • 全程监控,每天汇报制作进度

    (With whole Process Monitoring, we will report the progress to our customers everyday.)
  • 在规定交片期限内制作方提供小样,需求方提出修改意见,制作方修改

    (The producer provide a sample in the limited time, the demand side make some revising ideas and then the producer modify.)
  • 验收通过后需求方付尾款,制作方提供成片并存档

    (After check, the demand side should pay off the final payment, the producer provide the compete work and keep it in the archives.)
  • 需求方付清尾款后,制片工程文件保存一个月,合作完成

    (After the demand side pay pff the final payment, the construction document will be kept for 1 month, the cooperation is finished.)
  • 需求方提出视频制作需求

    (The demand side make their videos' demands.)
  • 确定制作难度和时间,制作方提供制作方案

    (Ensure the degree of difficulty and time, the producer provide the plan.)
  • 双方协商通过后签订合同,需求方预付50%定金

    (The producer provide a sample in the limited time, the demand side.)
  • 需求方向制作方提供制作所需素材后制作方开始制作

    (The demand side provide the required materials and then the producer begin to make.)
  • 根据脚本确定演员、场地、道具等

    (According to the script, ensure the actors, places and tools.)
  • 开拍前需求方向制作方支付40%拍摄定金

    (Before shooting, the demand side should repay 40% depoist.)
  • 全程监控,每天汇报制作进度

    (With whole Process Monitoring, we will report the progress to our customers everyday.)
  • 需求方付清尾款后,制片工程文件保存一个月,合作完成

    (After the demand side pay pff the final payment, the construction document will be kept for 1 month, the cooperation is finished.)
  • 在规定交片期限内制作方提供小样,需求方提出修改意见,制作方修改

    (The producer provide a sample in the limited time, the demand side make some revising ideas and then the producer modify.)
  • 验收通过后需求方付尾款,制作方提供成片并存档

    (After check, the demand side should pay off the final payment, the producer provide the compete work and keep it in the archives.)
  • 需求方付清尾款后,制片工程文件保存一个月,合作完成

    (After the demand side pay pff the final payment, the construction document will be kept for 1 month, the cooperation is finished.)
SSI ļʱ