Games' Promotional Videos/Fine Arts Sub-contracting
- The demand side
make their videos'
demands.
- Ensure the degree
of difficulty and time,
the producer provide
the plan.
- Sign a contrct after
the two sides negotiate,
the demand side prepay
50% deposit.
- The demand side provide
the required materials
and then the producer
begin to make.
- After the demand side
pay pff the final payment,
the construction document
will be kept for 1 month, the
cooperation is finished.
- After check, the demand
side should pay off the final
payment, the producer provide
the compete work and keep
it in the archives.
- The producer provide a sample
in the limited time, the demand
side make some revising ideas and
then the producer modify.
- With whole Process
Monitoring, we will report
the progress to our
customers everyday.
Advertisements TVC Micro films
- The demand side make
their videos' demands.
- Ensure the degree of
difficulty and time, the
producer provide the plan.
- Sign a contrct after the
two sides negotiate,
the demand side prepay
30% deposit.
- According to the script,
ensure the actors,
places and tools.
- Before shooting, the
demand side should
repay 40% depoist.
- After the demand
side pay pff the final
payment, the construction
document will be kept for
1 month, the cooperation
is finished.
- After check, the demand
side should pay off the
final payment, the producer
provide the compete work
and keep it in the archives.
- The producer provide a
sample in the limited time,
the demand side make
some revising ideas and
then the producer
modify.
- With whole
Process Monitoring,
we will report the progress
to our customers
everyday.
- Such as
post-production of
filming based on script.